Call us 616-457-2130

New Construction Waterproofing

Prevent Foundation Water Problems Before They Start

Long-term protection begins before the first shovel of soil goes back in. Georgetown Waterproofing installs engineered waterproofing systems for poured wall foundations — protecting your new build for decades to come.

Why It Matters

The Window of Opportunity Closes at Backfill

Water intrusion, foundation cracks, pipe penetrations, and drainage failures can result in significant structural damage if not addressed early. The most cost-effective time to waterproof any foundation is during the new construction phase — specifically before the soil is returned around the structure.

Once a home is backfilled, accessing the foundation to remedy the water intrusion requires extensive interior or exterior work.

Interior access would require removal of building materials, extracting mold, removing a section of the concrete floor, and draining water to the interior drainage system.

Exterior access would require excavation which involves removing landscaping, excavating around utilities and downspout drainage systems, re-waterproofing the foundation, and draining water to the exterior tile system.

Each one of these processes can cost tens of thousands of dollars. By contrast, installing a comprehensive waterproofing system during the build is an great investment relative to the protection it delivers.

At Georgetown Waterproofing, we have been protecting West Michigan foundations since 1972. Standard damp-proofing — a thin asphalt coating applied at many job sites — is insufficient to stop liquid water driven by hydrostatic pressure. True waterproofing creates an impermeable, flexible barrier that bridges shrinkage cracks, manages groundwater, and preserves the structural integrity of poured wall foundations for the life of the home.

Our Services

Comprehensive New Construction Waterproofing Solutions

Every system we install is engineered for the specific structure, soil conditions, and water table of your build site. We do not offer one-size-fits-all packages.

Drain Tile Systems

We install robust perimeter drain tile systems at the footing level using perforated pipe surrounded by clean crushed stone. This system intercepts groundwater before it can build pressure against your foundation walls and directs it safely away from the structure.

Waterproof Membranes

We apply high-performance, flexible elastomeric membranes directly to the exterior of poured foundation walls. These sheet membranes stretch to bridge natural shrinkage cracks, creating a continuous, seamless barrier against liquid water and soil moisture.

Protective Coatings

We apply fluid-based waterproofing coatings where appropriate. These thick, seamless coatings adhere tightly to the concrete surface, sealing pores against vapor transmission and providing an additional layer of defense against capillary action.

Builder Coordination

We work directly with general contractors, builders, and architects to ensure our installation aligns with your construction schedule. Our crews are licensed, insured, jobsite-safe, and builder-approved — preventing delays and ensuring proper backfill authorization.

The Benefits

Protect Your Investment from the Ground Up

Choosing an engineered waterproofing system during the new construction phase is one of the highest-return investments you can make in a new property. The benefits extend far beyond a dry basement.

Our Step-by-Step Waterproofing Workflow

How We Work

From initial site assessment through backfill authorization, we manage every phase of your new construction waterproofing installation with precision and professionalism.

1

Site Assessment & Engineering

Before a single wall is poured, we review architectural plans, evaluate soil conditions, and assess the local water table to engineer a custom waterproofing package tailored to your specific build site.

2

Surface Preparation

Once the foundation forms are stripped and the concrete has cured, we prepare the wall surfaces thoroughly — cleaning the concrete, addressing honeycombing, and ensuring optimal conditions for full membrane adhesion.

3

Membrane & Drain Tile Installation

We apply the waterproofing membrane and protective coatings to the exterior foundation walls in a continuous, overlapping system, while simultaneously installing the perimeter drain tile at the footing level.

4

Final Inspection & Backfill Authorization

Our team conducts a comprehensive quality assurance inspection of the complete system. Once verified, we coordinate directly with the general contractor to authorize safe backfilling.

Get Started Today

Don't Leave Your Foundation Vulnerable

The time to protect your new build is now — before the backfill goes in and the window closes. Whether you’re a homeowner planning a new construction project or a builder seeking a reliable waterproofing partner, Georgetown Waterproofing delivers engineered solutions with the reliability and warranty backing your project demands.

Prefer to talk now? Call (616) 457-2130